{"url":"https://newsforagent.com/news/2026-11-24/bentley-lrqa-carbon-neutrality-verification-crewe","markdown_url":"https://newsforagent.com/news/2026-11-24/bentley-lrqa-carbon-neutrality-verification-crewe.md","title":"Bentley Wins ISO Carbon Neutrality Verification at Crewe","headline":"Bentley Secures LRQA Verification of 2025 UK Carbon Neutrality as Drones Fit 2,030 Solar Panels","description":"Bentley Motors won LRQA verification of its 2025 UK carbon neutrality under ISO 14068-1, as cargo drones lifted 2,030 panels onto a 2.8 MW Crewe solar array.","section":"Business","published_at":"2026-11-24T13:28:38+00:00","modified_at":"2026-11-24T13:28:38+00:00","author":"News Desk","key_takeaways":["LRQA verified Bentley Motors' 2025 UK operational carbon neutrality declaration against ISO 14068-1:2023.","Bentley reported an 89 per cent absolute cut in directly comparable Scope 1 and Scope 2 emissions, from 17,482 tonnes CO2e in 2018 to 1,907 tonnes in 2025.","Cargo drones lifted 2,030 panels, each about 30 kg, onto four rooftops for a 2.8 MW solar installation at Crewe.","Bentley's renewed ISO 14001:2015 and ISO 50001:2018 certifications run until October 2029."],"companies":[{"name":"Bentley Motors","is_primary":true,"profile_url":"https://akta.pro/company-profiles/0002tvy/bentley-motors","website":"http://www.bentleymotors.com"},{"name":"LRQA","is_primary":false,"profile_url":"https://akta.pro/company-profiles/0006319/lrqa","website":"https://www.lrqa.com/en"},{"name":"Finlight.com","is_primary":false,"profile_url":"https://akta.pro/company-profiles/00048cd/finlight-com","website":"https://www.finlight.com"}],"source":{"publisher":"EuropaWire","title":"Bentley advances Crewe decarbonisation with ISO carbon neutrality verification and drone-assisted solar installation","url":"https://news.europawire.eu/bentley-advances-crewe-decarbonisation-with-iso-carbon-neutrality-verification-and-drone-assisted-solar-installation/eu-press-release/2026/11/24/14/10/06/189288/"},"other_sources":[{"publisher":"Businessgreen","url":"https://www.businessgreen.com/news/4539349/uk-cargo-drones-install-solar-panels-bentley-hq"}],"tags":["Business","Bentley Motors","LRQA","Finlight.com"],"body_markdown":"Bentley Motors has secured independent verification by LRQA of its 2025 UK operational carbon neutrality declaration against ISO 14068-1:2023, alongside renewed environmental and energy management certifications. The carmaker announced the verification on November 24, 2026, according to [EuropaWire](https://news.europawire.eu/bentley-advances-crewe-decarbonisation-with-iso-carbon-neutrality-verification-and-drone-assisted-solar-installation/eu-press-release/2026/11/24/14/10/06/189288/). Bentley Motors Limited, a wholly-owned Volkswagen AG subsidiary, builds the Bentayga, Flying Spur and Continental GT at its Crewe \"Dream Factory.\"\n\n## How LRQA Verified Bentley's 2025 Declaration\n\n[Bentley Motors](https://akta.pro/company-profiles/0002tvy/bentley-motors) said the verification covers its main Crewe campus and associated UK operations in the Cheshire region. The standard requires quantification and reporting of applicable Scope 1, Scope 2 and relevant Scope 3 emissions within the defined operational boundary. For 2025, Bentley recorded market-based residual emissions of 9,326 tonnes CO2e and retired 9,326 Verified Emissions Reductions Carbon Offset Credits to address them. The verification follows Bentley's move from PAS 2060, against which it first achieved certification in 2018.\n\n[LRQA](https://akta.pro/company-profiles/0006319/lrqa) acquired a 51% stake in LRQA Inspection Malaysia Sdn Bhd through K-Frontiers Sdn Bhd, making K-Frontiers its local partner in Malaysia, PR Newswire APAC reported in October 2026. Bentley reported an 89 per cent absolute reduction in directly comparable Scope 1 and Scope 2 emissions, from 17,482 tonnes CO2e in 2018 to 1,907 tonnes in 2025. Its renewed ISO 14001:2015 and ISO 50001:2018 certifications cover Pyms Lane and Orion Park operations in Crewe and remain valid until October 2029.\n\n## Drones Lift 2,030 Panels at Crewe\n\n[Businessgreen](https://www.businessgreen.com/news/4539349/uk-cargo-drones-install-solar-panels-bentley-hq) described the drone deployment as a UK first, with cargo drones lifting solar panels onto a 2.8MW rooftop installation at a Bentley paint shop in Crewe. The 2.8 MW array spans four rooftops at Bentley's new Paint Shop and uses 515-watt JA Solar panels, delivered by Push Power Limited in partnership with Finlight. XAG P150 Max drones lifted 2,030 panels, each weighing approximately 30 kg, positioning about one panel per minute and completing rooftop lifting in just over one week. The work brought the site's total panel count to more than 35,000.\n\nAndreas Lehe, Member of the Board for Manufacturing at Bentley Motors, said: \"These achievements reflect the continued evolution of our manufacturing operations in Crewe.\"\n\n## Bentley's Crewe Manufacturing Build-Out\n\nAccording to akta.pro [company records](https://akta.pro/company-data), Bentley inaugurated its new 12,500 sqm Crewe paint shop in June 2026, the first automotive paint shop in the world using Automated Guided Vehicles, and broke ground on an 11,620 sqm Integrated Logistics Centre raising on-site storage by 35%. The same records list more than 4,000 dedicated employees at the Crewe headquarters. Bentley reported revenue of €2.6 billion in 2025, down 1% from the previous year, and operating profit of €216 million.\n\n## Earlier Steps in Bentley's Crewe Programme\n\nIn November 2026, ZF Foxconn Chassis Modules began construction of a dedicated axle assembly plant in Stoke-on-Trent for Bentley Motors, EuropaWire reported, with production starting in 2027. Motor1.com reported the same month that Bentley's first EV, the Torcal, has sold out through 2027, with production starting in the first half of 2028. Businessgreen reported on November 23, 2026 that the drone installation is part of a new paint shop at Crewe.\n\n## What Comes Next at Crewe\n\nBentley's ISO 14001:2015 and ISO 50001:2018 certifications remain valid until October 2029. ZF Foxconn Chassis Modules plans to start production at its Stoke-on-Trent axle plant in 2027, and Torcal production is scheduled to begin in the first half of 2028.\n","publisher":{"name":"News for Agent","url":"https://newsforagent.com"}}