News for Agent

Daily business news: funding, M&A, launches

Research & Clinical Trials

Wildcat Resource Reports 14.8Mt Inferred Resource at Bolt Cutter Central in Pilbara

By ·

Key takeaways

  • Wildcat Resource reported a maiden Inferred resource of 14.8Mt at 1.0% Li2O at Bolt Cutter Central, 10 kilometres west of Tabba Tabba.
  • The estimate lifts Wildcat's combined lithium resources with Tabba Tabba by about 20% to 88.3Mt at 1.0% Li2O.
  • Initial testing of three drill-core samples returned average lithium recovery of 82.5% and a concentrate grade of 5.66% Li2O.

Wildcat Resources has reported a maiden Inferred mineral resource of 14.8 million tonnes at 1.0% lithium oxide at its Bolt Cutter Central project in Western Australia's Pilbara region. TradingView said the estimate, reported at a 0.7% Li2O cut-off grade, lifts the company's combined lithium resources with the nearby Tabba Tabba project by about 20% to 88.3Mt at 1.0% Li2O.

Wildcat Resource's Harry and Hermione Pegmatites

The resource covers the Harry and Hermione pegmatite swarms, where mineralisation reaches the surface and the principal Harry zone is locally thickest at shallow depths. About 90% of the Inferred resource sits within 160 metres of surface, which the company said prompts consideration of open-pit mining in future technical studies. The mineralised system remains open along strike and at depth, with further targets identified beyond the resource boundary and between established mineralised zones.

At a lower 0.6% Li2O cut-off, Bolt Cutter Central would contain 20.4Mt at 0.9% Li2O. Wildcat plans to test extensions to known pegmatites and additional prospects, and will examine mining economics, haulage and available plant capacity before deciding whether a satellite operation could contribute to the broader development.

Initial testing of three drill-core samples through the processing method developed for Tabba Tabba achieved average laboratory lithium recovery of 82.5% and a concentrate grade of 5.66% Li2O. Managing director AJ Saverimutto said: "Encouraging initial metallurgical results using the flowsheet developed for Tabba Tabba also provide a foundation for investigating Bolt Cutter Central as a source of supplementary feed." Geology manager Torrin Rowe said the work had "strengthened our understanding of the controls on mineralisation and provides a foundation for testing extensions to the known pegmatites and exploring additional compelling targets across our extensive Pilbara landholding."

The October 2026 definitive feasibility study for Tabba Tabba envisaged staged processing capacity rising from 2.25Mt a year to 4.5Mt a year. Based on a Probable Ore Reserve of 48.3Mt at 0.97% Li2O, that development case does not incorporate Bolt Cutter Central in its production schedule or financial forecasts, so the new Inferred resource is not an addition to the project's Ore Reserve. Wildcat held $76.1 million in cash at 30 September 2026.

Earlier Drilling at Bolt Cutter Central

In August 2026, Mining reported that Wildcat had released strong drilling results at Bolt Cutter Central and Tabba Tabba, including intersections up to 25.1m at 1.2% lithium oxide. In June 2026, Kalkine Media reported that Wildcat issued 300,000 unquoted performance rights to key management personnel on 11 June 2026 under its existing employee incentive scheme.

Bolt Cutter Central Studies and Mining Lease

Wildcat's planned work at Bolt Cutter Central includes a scoping study, environmental baseline assessments, further metallurgical testing and an application for a mining lease over the project. The company said its focus is to rapidly advance these assessments and test opportunities for further resource growth. More information on the company's projects is available on the Wildcat Resources website.

Companies in this story

Sources

Machine-readable: Markdown · JSON