{"url":"https://newsforagent.com/news/2026-11-19/acrow-mat-125-wilmington-bridge","markdown_url":"https://newsforagent.com/news/2026-11-19/acrow-mat-125-wilmington-bridge.md","title":"Acrow Deploys MAT 125 Towers on Wilmington Bridge","headline":"Acrow's MAT 125 Shoring Towers Restore Full Traffic to Wilmington's South Walnut Street Bridge","description":"Acrow deployed MAT 125 modular steel shoring towers to support Wilmington's 853-foot South Walnut Street Bridge, restoring full traffic.","section":"Product Launches","published_at":"2026-11-19T15:40:09+00:00","modified_at":"2026-11-19T15:40:09+00:00","author":"News Desk","key_takeaways":["Acrow supplied MAT 125 modular steel shoring towers to support the 853-foot South Walnut Street Bridge in Wilmington, Delaware.","The bridge carries about 26,000 vehicles daily and was restricted to one lane in each direction with a 20-ton weight limit after a mid-July 2026 inspection.","Acrow worked with DelDOT engineers and contractor Eastern Highway Specialists on the emergency repair."],"companies":[{"name":"Acrow Corporation of America","is_primary":true,"profile_url":"https://akta.pro/company-profiles/0004zed/acrow-corporation-of-america","website":"https://www.acrow.com"}],"source":{"publisher":"EIN Presswire","title":"Acrow’s Heavy-Duty MAT 125 Towers Support Damaged Bridge in Wilmington, Delaware","url":"https://www.einnews.com/pr_news/957734278/acrow-s-heavy-duty-mat-125-towers-support-damaged-bridge-in-wilmington-delaware"},"other_sources":[],"tags":["Product Launches","Acrow Corporation of America"],"body_markdown":"[Acrow Corporation of America](https://akta.pro/company-profiles/0004zed/acrow-corporation-of-america) supplied MAT 125 modular steel shoring towers to support the South Walnut Street Bridge in Wilmington, Delaware, restoring full traffic capacity to the 853-foot structure. [EIN Presswire](https://www.einnews.com/pr_news/957734278/acrow-s-heavy-duty-mat-125-towers-support-damaged-bridge-in-wilmington-delaware) reported the deployment on November 19, 2026.\n\n## How the MAT 125 Towers Were Deployed\n\nA maintenance inspection in mid-July 2026 found deteriorating concrete on some of the bridge's support columns. Traffic was cut to one lane in each direction and the maximum vehicle weight was lowered to 20 tons. The bridge carries about 26,000 vehicles per day over Norfolk Southern Railway tracks and links I-495 to the south with downtown Wilmington to the north.\n\nPlans were already in place to replace the bridge in the coming years, but the Delaware Department of Transportation determined emergency repairs were needed to return it to full capacity. Acrow worked with DelDOT engineers and project contractor Eastern Highway Specialists on a rapid solution using MAT 125 temporary support towers.\n\nThe MAT 125 system has a smaller bracing size and footprint than many alternatives and can be configured in multi-legged and braced-frame tower sizes. Its high-strength steel components are reusable, stocked at locations across North America for expedited delivery, and can often be assembled within hours even in restricted staging areas.\n\n\"MAT 125 is a robust and versatile system that can streamline construction by eliminating the time and cost of fabricating and assembling customized supports on site,\" said Jim Porreca, Market Development Manager, Shoring. \"Its compact footprint and flexible configurations make it well suited to a wide range of project environments, including sites where space is limited and rapid deployment is essential.\"\n\nRuss Parisi, Acrow's Vice President North America, said the company's shoring systems are \"engineered for versatility across a broad range of structural support applications\" and can help \"reduce safety risks, minimize disruption and keep critical infrastructure projects on or ahead of schedule.\"\n\n## Acrow's Record Across Bridge Projects\n\nAccording to akta.pro [company records](https://akta.pro/company-data), Acrow supplied a modular steel bridge for a major expansion at Bristol Airport in June 2025, extending its work into aviation infrastructure. The same records list a major Angola transportation program involving 186 modular steel structures, with the first structures completed. Acrow was founded in 1951 and is headquartered in Parsippany, New Jersey.\n\n## Earlier Acrow Bridge Installations\n\nIn October 2026, Acrow installed a modular steel bridge over the South Fork Skykomish River near Baring, Washington, to restore access after the Baring Bridge sustained storm damage in December 2025, GlobeNewswire reported. That same month, Acrow completed two modular steel bridges on Rhode Island's East Bay Bike Path, restoring access after the original 1880s structures closed in 2019. In July 2026, Acrow installed two modular steel bridges on the Cedar Point causeway in Sandusky, Ohio, ahead of the amusement park's May 9 opening.\n","publisher":{"name":"News for Agent","url":"https://newsforagent.com"}}