Product Launches
H-Power Debuts LC100dc 100kW Hydrogen Generator on UK Construction Site
By News Desk ·
Key takeaways
- H-Power launched the LC100dc, a 100kW hydrogen generator, with its first paying customer on a major UK construction project.
- The initial deployment is expected to use up to 10,000kg of green hydrogen and avoid more than 350 tonnes of carbon dioxide versus diesel.
- A 15-unit repeat order has been placed, and H-Power says customers are reaching cost parity with diesel on a weekly rental-and-fuel basis.
H-Power has launched the LC100dc, a 100kW hydrogen generator, and deployed it with its first paying customer on a major UK construction project. UK Investor Magazine reported the launch on November 16, 2026. The unit is designed for heavier-duty work such as charging site machinery and running large welfare facilities.
Inside the LC100dc Deployment
H-Power makes clean off-grid generators that run on hydrogen produced from ammonia, positioned as an alternative to the diesel generators used on building sites and other locations away from the grid. The new 100kW unit extends the company's existing generator range.
The initial deployment is expected to use up to 10,000kg of green hydrogen and avoid more than 350 tonnes of carbon dioxide compared with a comparable diesel operation. The launch builds on traction through Speedy Hydrogen Solutions, H-Power's joint venture with equipment-hire firm Speedy Hire, where the company says generator usage has outpaced its target. A 15-unit repeat order has been placed, and customers are reaching cost parity with diesel on a weekly rental-and-fuel basis.
John Wilson, CEO of H-Power plc, said: "The progress we are seeing with Speedy gives us increasing confidence in the commercial opportunity for the LC series. Utilisation has exceeded our target, customers are achieving cost parity with diesel on a weekly rental-plus-fuel basis and this has already translated into repeat demand for the LC30."
Wilson added: "The LC100dc is a direct response to customers who need higher levels of clean off-grid power. The speed at which we have been able to develop it demonstrates the flexibility of the platform and our ability to respond quickly as new applications emerge."
Hydrogen Generator Launches Across the Sector
VIVIFY Technology plans to present its 1MW containerized hydrogen power unit, the Flying Pig, at the Central Economic Council in Brussels on December 8, 2026, with manufacturing starting in January 2027, FinancialContent Business Page reported on November 6, 2026. Total Hydrogen Solutions unveiled its FCBG-H60 60kW hydrogen fuel cell generator, which integrates Honda's fuel cell module and qualifies for California CARB listing and CORE subsidy, with a planned 2026 market launch, Shanghai Metals Market reported on November 2, 2026.
VIVIFY's Brussels Presentation Date
VIVIFY Technology's Flying Pig presentation is scheduled for December 8, 2026, at the Central Economic Council in Brussels, according to FinancialContent Business Page. Manufacturing of the 1MW unit is set to begin in January 2027.
Companies in this story
- H-Power · www.h-power.co.uk